2021
Established a BHI(Thai) Co., Ltd
Established an Israel Corporation, BHI E&C Israel Co., Ltd
Awarded the nation’s first and largest 1.25MW Alkaline Water Electrolysis (AWE), Ansan Electrolysis, Korea
2020
Acquisition of ACHE Technology from KC Thermal
Acquisition of HRSG Technology from AmecFW
2019
Acquired KC Thermal Air Cooled Condenser Business Unit
2018
Entered into Overseas PC Boiler Market
Marked the 20th Anniversary of the Establishment
Signed MOU with GNS regarding Spent Nuclear Fuel & Nuclear Waste Management Business
2017
Acquired ‘New Excellent Product’ Certificate from Korea Agency for Technology and Standard (KATS), subsidiary of Ministry of Trade, Industry, and Energy of Republic of Korea,
for DeSOx Non-Leakage Type GGH using enamel coated fin tubes.
Acquired Amec Foster Wheeler Power Equipment Business Unit
Selected as ‘Next Generation No.1 Product’ by Ministry of Trade, Industry and Energy for, for DeSOx Non-Leakage Type GGH
using enamel coated fin tubes
2016
Awarded Pohang Works Steel Factory Power Plant Unit 3 & 4 Repowering & Retrofit Project as an EPC contractor
2015
BHI’s HRSG selected as 'World Class Product'
for 4 consecutive years
Expanded the market to 'Smart Nuclear Power Plant'
Ranked 1st in the world among HRSG suppliers
according to 2014 McCoy Power Report
2014
Signed the license agreement with Amec Foster Wheeler
for Air Pollution Control (APC) System
First HRSG project awarded in Africa
First super-sized HRSG project awarded in Japan
as the first foreign HRSG supplier
First HRSG project awarded in USA
Signed the license agreement with SPIG S.p.A.
for Air Cooled Condenser
2013
Awarded 'Golden Export Award' for exporting over $200,000,000 per year at the 50th Korea Trade Day Ceremony
Supplied 2 units of Surface Condensers designed
with BHI’s own technology for the first time
(Yeosu TPP Project in Korea)
Selected as one of the ‘Hidden Champions’ among companies listed in KOSDAQ (Korean Stock Exchange)
Succeeded in domestic production of Converter
for the Gwangyang 4 HR project
2012
Awarded PC boiler units 1 & 2 (Ultra Super Critical, 595 MW / Unit)
for Buk-Pyeong TPP Project in Korea
Signed the license agreement with Amec Foster Wheeler
for CFBC Boiler technology
Ranked 2nd in the world among HRSG suppliers
(2011 McCoy Power Report)
2011
Signed the contract for the supply of
BFG boiler for Indonesia ISM Project
First shipment of Condensers for AP-1000 Project
(Nuclear power plant in the U.S.)
Awarded the first Benson HRSG project in Korea
(Bugok CCPP Unit 3) from Siemens AG
2010
Signed the license agreement with Amec Foster Wheeler
for Oil & Gas Boiler technology
Signed the license agreement with Siemens AG
for Benson Once-Through technology for HRSG